Skip to content
DNA IT Labs

Keep requirements connected to testing and release.

Codebeamer and Polarion workflows for requirements, development, verification and release decisions.

Discuss your project
Application Lifecycle Management
REQUIREMENTSTESTSRESULTSREQ-12REQ-13TC-31TC-32TC-33

The problem we help address

Requirements in documents and test results in separate tools make it difficult to see what changed, what was verified and what is ready to release. ALM connects that evidence across the development lifecycle.

Relevant systems & technologies

  • PTC Codebeamer
  • Siemens Polarion
  • OSLC
  • APIs

What the engagement can cover

  • Structure requirements, ownership, baselines and change reviews.
  • Connect requirements to test cases, results and defects.
  • Configure release workflows and traceability reporting.
  • Define links between ALM, engineering and software delivery tools.

What you take away

Deliverables are agreed at the start of the engagement and may include:

  • Requirements structure and workflow configuration
  • Traceability model with representative records
  • Test and release reporting views
  • Integration mappings and administrator handover

Before you get started

Does ALM replace our development tools?

The assessment identifies which existing tools should remain and where integrations are needed. Tool replacement is a scope decision, not a prerequisite.

Can this support regulated development?

Traceability and controlled workflows can support your evidence requirements. Applicable standards, validation responsibilities and approval criteria must be agreed with your quality team.

Delivery approach

How an engagement runs.

  1. 01

    Discover

    Workshops with engineering, IT and quality to map the current workflow and agree priorities.

  2. 02

    Design

    A target data model, integration architecture and scope with measurable acceptance criteria.

  3. 03

    Build

    Configuration and integration in short iterations, reviewed against representative records.

  4. 04

    Validate

    Migration reconciliation, integration tests and user acceptance before cutover.

  5. 05

    Operate

    Handover, administrator guidance and support while the new workflow settles in.

Start with the workflow that needs attention.

Tell us about your systems, priorities and the teams involved. We agree scope, schedule and outputs before work begins.